3:54 PM
Bid 25: Res. PB Sample for report
Bid Item Order Quantity Report by Location ‑ Loc. Sort w/Hours‑Detail
Item
Code
Description
Unit
Bid
Quantity
Cost
Type #
Description
Order
Quantity
Total
Cost
Unit
Cost Type
Approx.
 Unit Cost
# 6 CONCRETE‑FOUNDATION
CY
111.10
Mat
Lab
 3.001300
15X18 Footing
250.00
LF
Material
Labor
469.00
6.25
HR
27,775.65
CY
1.30
Mat
Lab
 3.002500
Conc Slab 4''
1,500.00
SF
Material
Labor
19.00
30.00
HR
1,958.15
CY
15.07
Mat
Lab
 3.003000
Fill Dirt Below Slab Sub
15.00
CF
Material
Labor
1.00
15.00
HR
226.05
LF
38.70
Mat
Lab
 3.003500
Concrete Steps   Sub‑Bid
35.00
LF
Material
Labor
35.00
35.00
HR
1,354.50
Lab
Sub
 3.004800
Sand & Wire      Sub‑Bid
2.00
SF
Labor
Subcontract
2.00
2.00
HR
SF
56.74
28.37
Lab
Sub
 3.030100
6X6 10/10 Wire Mesh
5.00
SF
Labor
Subcontract
5.00
1.00
HR
RL
196.70
39.34
PC
0.66
Mat
Lab
 3.031100
# 3 (3)Per Run‑Rebar
150.00
LF
Material
Labor
26.00
3.00
HR
99.75
# 6 CONCRETE‑FOUNDATION =
31,667.54
Labor‑Hours
96.25
Equip‑Hours
Subcont‑Hours
Other‑Hours
# 15 PLASTERING
Sub
 9.000300
Stucco Std.Fin. 9'High
250.00
LF
Subcontract
250.00
YD
4,725.00
18.90
# 15 PLASTERING =
4,725.00
Labor‑Hours
Equip‑Hours
Subcont‑Hours
Other‑Hours
# 16 DRYWALL
Sub
 9.010700
1/2Drywall  8'H Intwall
175.00
LF
Subcontract
1,400.00
SF
808.50
4.62
# 16 DRYWALL =
808.50
Labor‑Hours
Equip‑Hours
Subcont‑Hours
Other‑Hours
Your tag line or anything or nothing here
Estimated By
Your Phone
Your Email
EasyEst Estimating Software
By CSC Software
Any City, CA 99999
Page 2 of 2
05/14/2019
3:54 PM
Bid 25: Res. PB Sample for report
Bid Item Order Quantity Report by Location ‑ Loc. Sort w/Hours‑Detail
Item
Code
Description
Unit
Bid
Quantity
Cost
Type #
Description
Order
Quantity
Total
Cost
Unit
Cost Type
Approx.
 Unit Cost
# 17 WINDOWS‑SLIDING DOOR
EA
337.50
Mat
Lab
 8.001700
Door‑Ext 3‑0X6‑8 Df 4Pan
1.00
EA
Material
Labor
1.00
2.50
HR
337.50
1
108.25
Mat
Lab
 8.010500
Door 2‑6 Pre‑Fit H/C
3.00
HB
Material
Labor
3.00
3.00
HR
324.75
EA
234.60
Mat
Lab
 8.034300
Door‑Fold  6‑0X8‑0    Hb
2.00
EA
Material
Labor
2.00
3.00
HR
469.20
# 17 WINDOWS‑SLIDING DOOR =
1,131.45
Labor‑Hours
8.50
Equip‑Hours
Subcont‑Hours
Other‑Hours
# 31 INSULATION
Sub
 7.023400
R‑19 Walls
2,500.00
SF
Subcontract
2,500.00
SF
918.75
0.36
Sub
 7.023700
R‑19 Ceil. Batts
1,500.00
SF
Subcontract
1,500.00
SF
551.25
0.36
# 31 INSULATION =
1,470.00
Labor‑Hours
Equip‑Hours
Subcont‑Hours
Other‑Hours
Total of Shown Bid Items *ONLY*
39,802.49
Labor‑Hours
104.75
Equip‑Hours
Subcont‑Hours
Other‑Hours
Your tag line or anything or nothing here